PROVISION OF EXIT RAMP / FLYOVER FROM EXISTING ABDULLAH PUR FLYOVER, FAISALABAD

Description:

The project PROVISION OF EXIT RAMP / FLYOVER FROM EXISTING ABDULLAH PUR FLYOVER, FAISALABAD was included in ADP (2023-2024) and approved on 03.08.2023 from PDWP with cost 1365.979 Million.

Traffic maneuvering form GTS chowk to Chak Jhumrah takes U Turn from Abdullahpur Flyover down ramp. This cause traffic block on the flyover and accidents. In order to resolve this traffic blockage and avoid accidents this project was proposed which starts from North of up ramp of existing flyover (GTS Chowk Side) and after crossing railway lines end along the Chak Jhumrah Road. This project will lead traffic from GTS, Station Chowk and Tariqabad to Jhumrah Road without interfering the traffic moving toward Jaranwala Road.

Scope of the Project:

Length of flyover

= 0.72km

Width of flyover

= 8.900m

No. of Lanes

= 2

Lane Width

= 3.3 m